Step 1Technical Documentation Review
Review product data sheets, safety data sheets, existing overseas test reports, thermal conductivity data, fire-related information, hydrophobic performance information, installation guides, packaging information and previous project references.
Step 2Application Assessment
Identify the target application scenario, including building facade, external wall system, prefabricated wall panel, industrial pipe insulation, steam pipeline, petrochemical plant, LNG system, offshore facility or other demanding environments.
Step 3Australian Compliance Gap Analysis
Coordinate with local consultants, engineers, testing laboratories or project stakeholders to identify the gap between existing overseas documentation and Australian project requirements.
Step 4Sample Supply and Local Testing
Arrange samples for customer review, engineering assessment, local testing, installation trial, sample wall system or pilot pipe insulation trial where required.
Step 5Pilot Project Selection
Prioritise small-scale, lower-risk, measurable and easy-to-review pilot applications before larger commercial rollout.
Step 6Pilot Installation Coordination
Support site review, installation planning, contractor communication, material delivery, installation record keeping, quality checklists and technical clarification.
Step 7Review and Scale-Up
Evaluate installation quality, suitability, customer feedback, energy or thermal performance observations, maintenance considerations, cost factors and potential for larger-scale application.